Kilimanjaro Lemosho Route climbing Tour Overview
“Join us on an 8-day guided climbing tour of Kilimanjaro on the Lemosho Route. Our experienced guides will lead you safely to the summit of Africa’s highest peak, while you take in the breathtaking views and diverse ecosystems. All necessary gear and accommodations are included. Book your adventure today!”
The Lemosho route can be done in as little as six days (five nights) on the mountain. However, it is ideally tackled over eight days (seven nights) for a better altitude acclimatization schedule. Lemosho starts in lush, fertile rainforest. It is the first ecological zone you encounter on Kilimanjaro. Buffalo and elephant sightings are possible on the first day trekking through the forest, The route is the longest distance to trek up Kilimanjaro approximately 70 km/ 42 miles from gate to gate. It is designed for physically fit people with some hiking experience.
The Lemosho route is one of our preferred routes due to its low traffic, beautiful scenery and a high summit success rate. The Lemosho route starts off from the west, beginning with a long drive from Moshi to Londorossi Gate. From there, the first two days are spent trekking through the lush rainforest to Shira Plateau. We recommend a minimum of 7 days to attempt this route but 8 days is preferable for better acclimatization and summit success. The Lemosho route joins the Machame route at Shira 2 Camp and then follows the same route through the southern circuit and descending at Mweka Gate.
Comments
- Please note that our itinerary is flexible and can be modified until it suits your needs and wishes.
- This is a quotation only. No reservations or arrangements have been confirmed on your behalf pending your authority to proceed and the final itinerary is subject to availability.
- All prices quoted for our Lemosho Route Kilimanjaro climbing tours are current and are subject to change at any time due to cost increases such as Park Entry fees or Hotel| Airline rates increases that are beyond our control. As a result, reserves the right to re-quote on a quotation if confirmation of the itinerary is not received within 14 working days from date of quotation.
- For more safari tours